Corrotherm International

“Well done to you and all the team at Vear Group.  A very smooth running project and well executed.”

Bob Dalton
HPW Architect

Full case study

Light Industrial

Light industrial projects such as business park construction, industrial unit refurbishment, and M & E upgrades can be completed within tight timeframes and to a high standard.

We understand that if a building is still being used while works are carried out it is important that we cause as little disturbance as possible. This is one of the many things that need to be planned for.

With pressures on space in our towns and cities we know that extensive building works can cause problems for local communities. We take pride in engaging with all interested parties to ensure disruption to their businesses is kept to an absolute minimum.

The environmental impact that both new build and refurbishment can have, is always at the forefront of our mind when we are planning a project. We endeavour to recycle as much as possible and ensure that all waste is handled responsibly.

I would like to thank the Vear Group team for their excellent work and attitude throughout this project which was also confirmed by the design team throughout the project. Overall the project was very well managed and no noticeable impact to the users of the building which is really positive.

John Lewthwaite

Senior Project Manager, Mace Group (for HSBC)

We aim to offer our clients an experience that is unrivalled in our industry which in turn will provide repeat business for the future.

+44 (0)23 8025 2931

    Main Switchboard

vear@veargroup.com